Changes between Version 17 and Version 18 of construction_guide


Ignore:
Timestamp:
Feb 8, 2014, 11:13:25 PM (11 years ago)
Author:
smoser
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • construction_guide

    v17 v18  
    1515  - a power supply for 12V and 5V (e.g. [http://www.meanwell.com/search/ADD-55/ADD-55-spec.pdf Mean Well ADD-55A])
    1616  - an external antenna for the flarm device
    17   - a box to incorporate and connect all components (e.g a small [http://www.pelishop.com/peli-cases-small.html Peli Case], 30x30x15cm minimal interior dimensions)
     17  - a box to incorporate and connect all components (e.g a small [http://www.pelishop.com/peli-cases-small.html Peli Case], 25x25x12cm minimal interior dimensions)
    1818  - for the [attachment:communication_cable.jpg  communication cable] between Flarm, Raspberry and Powersupply
    1919    - a short RJ45 cable (will be cut in parts)
     
    2323=== Step-by-Step ===
    2424
     25==== Bring the Raspberry into service ====
    2526
     27... to be written
    2628
     29==== Wire the components ====
     30
     31... to be written
     32
     33==== Configuration & Testing ====
     34
     35... to be written
     36
     37==== Final installation ====
     38
     39... to be written
     40